-
Due to the filming of Captain America, the #76 Broadway - Turney will be rerouted on the following dates:
On Monday, May 20, 2013 - Friday, May 24, 2013, E 3, E 6 and Rockwell will have total closures. E 6 between Lakeside and St Clair will have an intermittent closure as well as Superior Ave. At a date to be determined Lakeside between E 9 and E Mall Dr. will have an intermittent closure.
During that time, the following reroute will be in effect:
Northbound: Regular route.
Southbound: Regular route to Superior - E 3, continue Superior, right on East Roadway, left on Rockwell returning to regular route.
Evening Trips Only
Northbound: Regular route to Ontario - Prospect, left on West Prospect, across Superior, W 6, right on St. Clair, right on W 3 to layover.
Southbound: From layover, right on Superior, left on West Prospect, right on Ontario returning to regular route.
From Tuesday, May 28, 2013 - Saturday, June 1, 2013, Superior will be closed from Ontario to E 17, E 3rd will be closed from Superior and Rockwell, E 9 and E 12 will be closed between Rockwell and Walnut, and E 13 will be closed between Payne and Rockwell.
During that time, the following reroute will be in effect:
Westbound: Regular route to Ontario - Superior, continue Ontario, right on St. Clair, left on E 9, right on Lakeside to layover.
Eastbound: From layover, right on E 12, right on St. Clair, left on Ontario returning to regular route.
Evening Trips Only
Westbound: Regular route to Ontario - Euclid, continue Ontario, left on Rockwell, left on West Roadway to layover.
Eastbound: From layover, left on Superior, right on Ontario returning to regular route.